Verifying Installation

During router installation, you must verify installation each time you power on the router, making sure
that:
There is enough space around the router for heat-dissipation, and the workbench is stable enough.
The power supply that the power cord connects to is compliant with that required by the router.
The PGND wire of the router is correctly connected.
The router is correctly connected to other devices, such as the console terminal.
The check after installation is very important. The stability, grounding of the router and power supply will
directly affect the operation of the router.