Filling The Heating System And Eliminating Air; Emptying The Heating System - Riello CONDEXA HPR Series Instructions For The Installer And For The Technical Assistance Centre

Table of Contents

Advertisement

INSTALLATION
9
The use of a longer pipe causes a loss of output of the
boiler.
9
The exhaust pipes can face in the direction most suit-
ed to the installation requirements.
9
As envisaged by current legislation, the boiler is de-
signed to take in and dispose of flue gas condensate
and/or rainwater condensate deriving from the flue
gas discharge system via its own drain-trap.
9
If a condensate relaunch pump is installed, check the
technical output data (provided by the manufacturer)
to ensure it works properly.
For changes of direction, use a T-fitting with inspection
plug which allows easy periodic cleaning of the pipes.
Always ensure that the inspection plugs are hermetically
closed, with the corresponding gasket in good condition,
after cleaning.
2.14 Filling the heating system and
eliminating air
In the case of a new installation or replacement of the boil-
er, it is necessary to clean the heating system beforehand.
To ensure the device works well, after every cleaning inter-
vention remember to top up the additives and/or chemical
treatments (e.g. anti-freeze liquids, filming agents, etc.)
and check the parameters are within the values indicated
in the tables.
PARAMETERS
UM
pH value
Hardness
°F
Appearance
Fe
mg/kg
Cu
mg/kg
For the Condexa HPR boiler, there must be a system fill-
ing line, preferably connected to the return line.
Before emptying or filling the system, disconnect the
appliance from the electricity supply. For changes of di-
rection, use a T-shaped fitting with an inspection plug
that allows the piping to be easily cleaned periodically.
Always make sure that after cleaning the inspection
plugs are hermetically sealed with the relative gasket.
HEATING CIRCUIT
FILLING
WATER
WATER
7–8
-
-
< 15
-
clear
<0.5
-
<0.1
-
1
ƒ Before filling the system, make sure the air outlet plug
of the venting valve in the boiler is open (loosened)
ƒ Use the pressure gauge to check the pressure reaches
the value envisaged for the system (1.5-2.0 bar)
ƒ Reconnecting the electricity supply; the boiler will run
the automatic venting cycle
NOTA: every time the boiler is electrically powered, the auto-
matic venting cycle is run (it lasts 6 min).
NOTE: if there is a water alarm (E040, E041 or E042), the venting
cycle cannot be carried out.
ƒ If the system pressure is lower than 1 bar following the
venting cycle, fill the system again.

2.15 Emptying the heating system

Before draining, set the boiler to OFF and shut off the electrical
supply setting the main system switch to OFF.
ƒ Close the heating system taps (if present).
ƒ Connect a pipe to the system degassing/discharge tap (C),
then manually loosen the valve to let the water flow out.
ƒ After completing the operations, remove the pipe from the
system degassing/discharge tap (C) and close the valve.
C
32
+
+
RESET
MENU