Daikin ETBH16E9W Installer's Reference Manual page 220

Table of Contents

Advertisement

10
|
Configuration
Installer reference guide
220
b Auxiliary boiler inactive
If the outdoor
temperature...
Drops below T
calc
Rises above T
+3°C
calc
INFORMATION
The permission signal for the auxiliary boiler is located on the EKRP1HBAA (digital I/O
PCB). When it is activated, the contact X1, X2 is closed and open when it is
deactivated. See illustration below for the schematic location of this contact.
X2M
YC Y1 Y2 Y3 Y4
#
Code
9.C.3
[C-03]
9.C.4
[C-04]
To determine the value of [C‑03], proceed as follows:
1 Determine the COP (= coefficient of performance) using the formula:
Formula
COP = (Electricity price / gas price)
boiler efficiency
(a)
Make sure to use the same units of measurement for the electricity price and gas price
(example: both c€/kWh).
2 Determine the value of [C‑03] using the graph. For an example, see the table
legend.
Space heating by the heat
pump system...
Stops
Starts
OFF ON
SS1
X1M
Range: –25°C~25°C (step: 1°C)
Range: 2°C~10°C (step: 1°C)
The higher the value of [C‑04], the higher the
accuracy of the switch-over between the heat
pump system and the auxiliary boiler.
(a)
×
If:
Electricity price: 20 c€/kWh
Gas price: 6 c€/kWh
Boiler efficiency: 0.9
Then: COP = (20/6)×0.9 = 3
Then...
Bivalent signal for the
auxiliary boiler is...
Active
Inactive
Description
Example
EPRA14~18D + ETBH/X16E
Daikin Altherma 3 H HT W
4P644736-1D – 2023.10

Advertisement

Table of Contents
loading

Table of Contents