Daikin ETBH16E9W Installer's Reference Manual page 132

Table of Contents

Advertisement

9
|
Electrical installation
Installer reference guide
132
A
B
C
B
2 Fix the cables with cable ties to the cable tie mountings.
In case of high voltage Smart Grid contacts
Wires (Smart Grid pulse meter): 0.5 mm²
Wires (high voltage Smart Grid contacts): 1 mm²
[9.8.4]=3 (Benefit kWh power supply = Smart Grid)
[9.8.5] Smart Grid operation mode
[9.8.6] Allow electrical heaters
[9.8.7] Enable room buffering
[9.8.8] Limit setting kW
The wiring of the Smart Grid in case of high voltage contacts is as follows:
X10M
1
A1
A2
N
L
N
L
K1A
2
1
STEP 3
STEP 1 Smart Grid relay kit installation
STEP 2 Low voltage connections
STEP 3 High voltage connections
1
High voltage Smart Grid contact 1
2
High voltage Smart Grid contact 2
a, b Coil sides of relays
A
X5M.4
X5M.3
X5M.10
X5M.9
X5M.6
X5M.5
C
X5M
2
3
4
10
9
6
5
A1
A2
K2A
K1A
K2A
a
b
c
d
STEP 1
S4S
1
S10S
2
S11S
X5M
14
13
4
3
S4S
e
f
STEP 2
EPRA14~18D + ETBH/X16E
Daikin Altherma 3 H HT W
4P644736-1D – 2023.10

Advertisement

Table of Contents
loading

Table of Contents