Daikin ETBH16E9W Installer's Reference Manual page 108

Table of Contents

Advertisement

9
|
Electrical installation
Installer reference guide
108
b
L
a
N
b
L
1N~,
50 Hz,
N
230 V AC
a Power supply cable (field supply)
b Field wiring
F1B Overcurrent fuse (field supply). Recommended fuse: 2 pole, 32 A fuse, C curve.
Q1DI Earth leakage circuit breaker (30 mA)(field supply)
2 Interconnection cable (indoor↔outdoor):
▪ Route the cable through the frame.
▪ Connect the wires to the terminal block (make sure the numbers match with
the numbers on the indoor unit) and the earth screw.
▪ Fix the cable with a cable tie.
Wires: (3+GND)×1.5 mm²
L N PE
F1B
Q1DI
BRN
2
1
BLU
4
3
YLW/GRN
a
EPRA14~18D + ETBH/X16E
Daikin Altherma 3 H HT W
4P644736-1D – 2023.10

Advertisement

Table of Contents
loading

Table of Contents