3-22 Installation guidelines
Procedure 3-6 (continued)
Mounting the cabinet on the pad
Action
Step
1
2
3
4
5
6
7
8
9
10
11
12
13
14
AN2016 Cabinet User Guide
Action
Remove the anchor bolts and washers from the concrete pad.
Note: Save the bolts to attach the cabinet to the concrete pad.
Make sure that hard hats are worn by all personnel during the lift.
Lift the cabinet using the crane.
Position the cabinet above the concrete pad.
Note 1: If OSP cables are already installed through the pad surface, route
the cables through the appropriate openings before you set the cabinet
completely down on the pad.
Note 2: The cabinet must be lowered onto the pad in a level position parallel
with the surface of the pad. The cabinet must be in alignment with the
anchoring bolts and conduits protruding from the pad.
Lower the cabinet over the anchoring bolts.
Observe the cabinet to pad alignment as the cabinet is lowered to the pad.
Note: The rubber pads must extend about 1/4-in. around the base edge of
the cabinet end compartments.
Check leveling with a spirit level, with the electronic compartment doors still
closed.
Note 1: If doors are out of alignment at the top edge by more than 1/16 inch,
use spacers to level the cabinet and refer to
cabinet" for cabinet leveling.
Note 2: If doors are in alignment, proceed with the installation.
Reinstall the four anchor bolts from the concrete pad, the four large square
mounting washers and round flat washers (see
Tighten the nuts to 75 ft-lb torque.
Disconnect the lifting cable sling from the lifting eyebolts.
Remove the tag line and the four lifting eyebolts and discard.
Replace the eyebolts with the nylon hex head bolts that are included with
each cabinet.
Note: Do not remove the desiccant pouches from the bottom of the
compartments until commercial power is connected.
Caulk any gaps between the cabinet bottom and rubber pads with locally
approved compound.
Continue the cabinet installation process (see
cable in the split sleeve").
—end—
Rel 1.0 Standard May 1999
Procedure
3-7, "Leveling the
Figure
3-17).
Procedure
3-8, "Installing the