Nortel AccessNode 2016 User Manual page 170

Table of Contents

Advertisement

6-34 Ordering information
Table 6-12
2016-line cabinet. For the equipment frame/bay layouts and mounting
positions, see
Table 6-12
1344- to 2016-line expansion kit equipment (standard) for AN2016 Cabinet
PEC
NTNR10AA includes
Note: A second ABM is required to support the additional CDS shelves.
NT4K14AB
NT4K1490
NT4K16CA
NT4K10AB
NT4K1033
NT4K0610
P0846202
NT4K84BA
NT4K1024
NT4K1422
P0732671
NT4K85JB
NT4K85KA
A0630076
NTNR13AA includes
NT4K12AB
NT4K1222
NT4K82DA
NT4K82DB
NT4K82DC
NT4K86NA
NT4K0610
AN2016 Cabinet User Guide
lists the standard equipment for an expansion kit from 1344- to
Figure
6-10,
Figure 6-11
Description
AccessNode hardware kit
Breaker interface panel
Breaker interface front cover assembly
Local craft access panel, modular business package
Access common equipment shelf
ABM front shelf cover
Fan shelf assembly, eight fans
Fan shelf assembly cover
Power cable common equipment
ABM english label kit
Breaker interface panel english label kit
Product label identification
Termination, cooling unit interface
BIP control cable assembly
Circuit breaker 30 A 80 V dc
Copper distribution shelf kit for 2016 line
Copper distribution shelf
Line shelf label kit
Cable assembly, A/B link VF/T/D, CDS 1
Cable assembly, A/B link VF/T/D, CDS 2
Cable assembly, A/B link VF/T/D, CDS 3
Shelf metallic test pair cable assembly, 2 ft long
Fan shelf assembly, eight fans
—continued—
Rel 1.0 Standard May 1999
and
Figure
6-12.
Quantity
1
1
1
1
1
1
1
1
2
1
1
1
1
1
4
1
7
7
1
1
1
5
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

An2016

Table of Contents