Advertisement

3-44 Installation guidelines
Procedure 3-13 (continued)
Installing batteries
Step
10
Figure 3-27
Knock out for external battery vault
Table 3-4
Battery cable length for each string in the cabinet
Battery string
1 and 5
2 and 6
3 and 7
4 and 8
Note 1: You must provide the Anderson connector.
Note 2: You must determine the cable length from the
external vault to the cabinet.
AN2016 Cabinet User Guide
Action
Install the batteries into the external vault according to local practices and
battery manufacturer's recommendations.
—end—
Length
76 in.
88 in.
106 in.
124 in.
Rel 1.0 Standard May 1999