3-14 Installation guidelines
Procedure 3-4 (continued)
Preparing the cabinet for installation
Step
11
12
13
14
15
Figure 3-6
Tamper resistant wrench
AN2016 Cabinet User Guide
Action
Insert the lifting cable sling connecting links securely through all four lifting
eye bolts (see
Figure
3-10).
Take up the slack with the crane to prevent the cabinet from tipping when you
remove the pallet brackets.
Note 1: Do not tighten the cables so that the pallet lifts. The weight of the
pallet will make it difficult to remove the bracket bolt.
Remove the lower front base panel of the termination end compartment (see
Figure
3-11).
Remove the bolts from the pallet mounting brackets that secure the cabinet
to the pallet (see
Figure
Continue the cabinet installation process (see
cabinet on the pad").
—end—
Rel 1.0 Standard May 1999
3-12).
Procedure
3-6, "Mounting the