Connecting The Alarms - Nortel AccessNode 2016 User Manual

Table of Contents

Advertisement

4-6 Alarms
Procedure 4-1

Connecting the alarms

Use this procedure to connect the alarms to be reported to the ABM #1 shelf.
Requirements
You need the following tools and materials:
Action
Step
1
2
3
AN2016 Cabinet User Guide
wire-wrap tool
solid wire 24 AWG
Action
Select the alarms to be reported to the ABM #1 shelf and the input telemetry
points to be used (see
Refer to procedure 9.6, "Changing the telemetry input description",
(NTP 323-3001-032). The Engineering and Ordering Information is part of
AccessNode, Release AN16 or later.
Use the solid wire 24 AWG to wire wrap the alarms from the input telemetry.
Note: After you connect the alarms, provision them so that the appropriate
label shows up at the alarm monitoring facility.
Rel 1.0 Standard May 1999
Table 4-1
and
Figure
—end—
4-2).

Advertisement

Table of Contents
loading

This manual is also suitable for:

An2016

Table of Contents