Procedure 3-4 (continued)
Preparing the cabinet for installation
Requirements
You need the following tools and materials:
Action
Step
1
2
3
4
5
6
7
8
9
10
one derrick (crane) capable of lifting 4,000 lbs (1,809 kg)
two, 8-ft long (minimum) wire rope slings (each with 4,000 lbs [1,809 kg]
capacity)
four connecting links to attach wire rope slings to the cabinet lifting eye
bolts
5/8 in. diameter rope, approximately 75-ft long (used as a tag line)
standard hex-type security tool or 216-type tool
Action
Open the doors of the main and of the end compartments. To open the
latches on the cabinet main and end doors, insert the tamper-proof wrench
into the cup seams hex bolt (see
Turn the wrench a few degrees clockwise to release the latch (see
Figure
3-7).
Note: Do not over-rotate.
Secure the wind latch (see
Inspect the inside of the cabinet to make sure there is no damage to
equipment.
Clean all debris from the concrete pad.
Remove the battery tray cover.
Remove the two rubber gasket sections from the supplied installation kit.
Place each section into position on the foundation pad. Make sure that the
gasket is under the bottom of the cabinet when it is in placed (see
Close and latch the main compartment doors in preparation for cabinet
placement.
Keep the SPC and termination compartment door open and secured with the
wind latch.
Note: If outside plant (OSP) cables are already installed through the pad
surface (see
Procedure
Figure
3-6).
Figure
3-8).
3-5, "Routing the cables to the mounting pad").
—continued—
User Guide
Installation guidelines 3-13
Figure
Rel 1.0 Standard May 1999
3-9).