Yamaha FJR 1300 AE 2014 Service Manual page 131

Table of Contents

Advertisement

1. Ignition coil #1 coupler
2. Clutch hose
3. Front wheel sensor lead
4. Left front fork stepping motor lead
5. Right front fork stepping motor lead
6. Immobilizer unit lead
7. Main switch lead
8. Throttle cable (decelerator cable)
9. Throttle cable (accelerator cable)
10. Brake hose (brake pipe/upper joint assembly to
front brake calipers)
11. Brake hose (metering valve to right front brake
caliper)
12. Brake hose (front brake master cylinder to brake
pipe/lower joint assembly)
13. ABS test coupler lead
14. Main fuse lead
15. Positive battery lead
16. Starter motor lead
17. Fuse box 1
18. Fuse box 3
19. Cruise control system fuse
20. Brake light fuse
21. Fuse box 2
22. SCU (suspension control unit) fuse
23. Coolant temperature sensor coupler
24. Ignition coil #4 coupler
25. Ignition coil #3 coupler
26. Grip cancel switch coupler
27. Fuel injector #4 coupler
28. Fuel pump lead
29. Fuel sender lead
30. Fuel injector #3 coupler
31. Air induction system solenoid coupler
32. Intake air pressure sensor coupler
33. Fuel injector #2 coupler
34. Atmospheric pressure sensor coupler
35. Fuel injector #1 coupler
36. Throttle position sensor lead
37. Ignition coil #2 coupler
38. Sidestand switch lead
39. Oil level switch lead
40. Cylinder identification sensor lead
41. AC magneto lead
42. Main fuse coupler
43. ABS test coupler
A. Fasten the main switch lead, immobilizer unit lead,
front wheel sensor lead, and front fork stepping
motor leads to the wire harness with a plastic
locking tie, making sure to align the tie with the
white tape on the harness. Face the end of the
plastic locking tie forward. Do not cut off the excess
end of the plastic locking tie.
B. Position the plastic locking tie 0
in) from the end of the protective sleeve of the front
wheel sensor lead.
C. Position the plastic locking tie 10
1.18 in) from the end of the protective sleeve of the
immobilizer unit lead.
D. Route the throttle cables and brake hoses through
the right opening in the frame.
20 mm (0
0.79
30 mm (0.39
2-60
CABLE ROUTING
E. Install the immobilizer unit coupler holder so that
the end with the bolt is facing forward.
F. Install the positive battery lead terminal so that it is
not positioned to the outside of the starter relay.
G. Install the starter motor lead terminal so that it is
not positioned to the outside of the starter relay.
H. Install the fuse holders so that the hinged portions
of the holders are facing inward.
I.
Insert the projection on the wire harness holder
completely into the hole in the plate on the cylinder
head cover.
J. Insert the projection on the wire harness holder
completely into the hole in the plate on the throttle
body.
K. Insert the projection on the wire harness holder
completely into the hole in the plate on the fuel rail.
L. Route the fuel injector lead under the air induction
system hose.
M. Route the throttle position sensor lead under the
air induction system hose.
N. Route the ignition coil #2 lead over the air
induction system hoses.
O. Route the cylinder identification sensor lead over
the air induction system hoses.
P. Route the AC magneto lead under the oil level
switch lead and sidestand switch lead, and above
the wire harness.
Q. Install the main fuse coupler holder completely
onto the tab on the plate.
R. Install the ABS test coupler completely onto the
tab on the plate.
S. Pass the throttle cables through the guide.

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Fjr 1300 aee 2014

Table of Contents