4. Loosen the eight Torx screws
5. Check the flat seal
Replace the flat seal if it is damaged or porous.
6. Swivel the analyzer module
7. Secure the analyzer module
– Use eight Torx screws on the base of the housing
– Use two Torx screws on the rear panel with a torque of 2.5 Nm.
8. Connect the gas lines, see section "Gas connections (Page 91)".
Wall-mounted device
Operating Instructions, 07/2023, A5E31930403-AB
Installing / removing and connecting analyzer and option modules
7.5 Installing OXYMAT 7, high-temperature version
③
and remove the two blank plates at slots 1 and 2.
④
for damage.
⑥
forward and insert it into the wall housing
⑥
in the slot as follows:
①
③
with a torque of 0.8 Nm.
.
71