Stiga MP 84/98 Workshop Manual page 62

Table of Contents

Advertisement

WORKSHOP MANUAL
MP 84/98 - MP 84/98 Hy
General informations:
­­­
Related topics:
[
4.5]
Aligning the cutting deck
Map of functional units
REPLACEMENT OF THE LIFTING CABLE
Put blocks beneath the cutting deck in line with the
centre lines of the blades:
– at the front 26 mm (1)
– at the back 32 mm (2)
2 - h = 32 mm
Put the height lever in position «1» and completely
loosen the adjuster (3).
Loosen the screw (4) and remove the drive pulley (5)
to slide out the cable (6).
Unhook the end (7) of the cable (6) from the control
le ver (8) and remove the cable.
To assemble, perform the operations described above
in reverse order, making sure the cable (6) correctly
passes through the slots (9) and (10).
After restoring adjuster tension (3), the cutting deck
should return to the alignment conditions previous to
cable replacement. If this is not the case...
Adjust the alignment of the deck.
CHAPTER
6.9
1 - h = 26 mm
10
REVISION
FROM ...
PAGE
1
2018
1 of 1
3
5
6
4
9
6
7
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mp 84/98 hy

Table of Contents