6. Remove the carrier cable ASY from the card holder.
(Carrier cable holder is behind the carriage. Slide it to remove it.)
Installation
1. Install the SP timing belt by reversing the removal procedure.
The following adjustments are required:
- Print head gap adjustment (for upper angle).
(You may omit, when having not loosened the screw.)
- Card guide position adjustment
- TOF sensor's voltage adjustment
- Vertical Alignment (V-ALMNT) adjustment
- Top-of-forms adjustment (factory use)
- Skew detection value adjustment
- APTC detection sensor adjustment
(45) CES Scale replacement
Removal
1. Remove the upper cover.
2. Remove the CES spring.
3.Remove the screw securing the CES scale , and remove the CES scale.
Installation
Belt cramp
Figure 4.68 SP Timing Belt replacement
90
Screw
SP timing belt
Screw