To Connect The Recirculation Piping - Daikin EBVZ-D9W Installer's Reference Manual

Table of Contents

Advertisement

8.6.4 To connect the recirculation piping

ERLA11~16D + EBVZ16S18+23D
Daikin Altherma 3 R F
4P643604-1B – 2022.05
NOTICE
A drain device and pressure relief device must be installed on the cold water inlet
connection of the domestic hot water cylinder.
To avoid back siphonage, it is recommended to install a non-return valve on the
water inlet of the domestic hot water tank in accordance with the applicable
legislation.
It is recommended to install a pressure reducing valve on the cold water inlet in
accordance with the applicable legislation.
An expansion vessel must be installed on the cold water inlet.
It is recommended to install the pressure relief valve on a higher position than
the top of the domestic hot water tank. Heating of the domestic hot water tank
causes water to expand and without pressure relief valve the water pressure
inside the tank can rise above the tank design pressure. Also the field installation
(piping, tapping points, etc.) connected to the tank is subjected to this high
pressure. To prevent this, a pressure relief valve needs to be installed. The
overpressure prevention depends on the correct operation of the field installed
pressure relief valve. If this is NOT working correctly, overpressure will deform
the tank and water leakage may occur. To confirm good operation, regular
maintenance is required.
NOTICE
Overpressure bypass valve (delivered as accessory). We recommend to install the
overpressure bypass valve in the space heating water circuit.
Mind the minimum water volume when choosing the installation location of the
overpressure bypass valve (at the indoor unit, or at the collector). See
check the water volume and flow
Mind the minimum flow rate when adjusting the overpressure bypass valve
setting. See
"12.4.1 Minimum flow
NOTICE
If you install this unit as a single-zone application, then:
Setup. Install a bypass between the space heating water inlet and outlet of the
additional zone (=direct zone). Do NOT interrupt the water flow by closing the shut-
off valves.
a Bypass
Configuration. Set field setting [7-02]=0 (Number of zones = Single zone).
NOTICE
Install air purge valves at all local high points.
Prerequisite: Only required if you need recirculation in your system.
4
rate" [
 93].
"8.5.3  To check the water volume and flow
4
rate" [
 228].
a
8
Piping installation
|
"8.5.3 To
4
rate"  [
  93] and
Installer reference guide
99

Advertisement

Table of Contents
loading

Table of Contents