To Install The Mounting Plate; After Connecting The Electrical Wiring To The Indoor Unit - Daikin EBVZ-D9W Installer's Reference Manual

Table of Contents

Advertisement

9
|
Electrical installation

9.4 To install the mounting plate

9.5 After connecting the electrical wiring to the indoor unit

Installer reference guide
128
A
1
High voltage Smart Grid contact 1
2
High voltage Smart Grid contact 2
B
A
B
4 Fix the cables with cable ties to the cable tie mountings. If necessary, bundle
excessive cable length with a cable tie.
Before you can install the demand PCB or digital I/O PCB, you have to install the
mounting plate as follows:
a
a Mounting plate + screw (delivered as accessory)
b For demand PCB (A8P: EKRP1AHTA)
c For digital I/O PCB (A4P: EKRP1HBAA)
To prevent water ingress to the switch box, seal the low voltage wiring intake using
the sealing tape (delivered as accessory).
X10M.1
L
1
X10M.2
N
X10M.3
L
2
X10M.4
N
X10M
1 2 3 4
b
c
ERLA11~16D + EBVZ16S18+23D
Daikin Altherma 3 R F
4P643604-1B – 2022.05

Advertisement

Table of Contents
loading

Table of Contents