Piping installation
Installer reference guide
98
b1
b2
a1 Additional zone – Space heating/cooling – Water IN (screw connection, 1")
a2 Additional zone – Space heating/cooling – Water OUT (screw connection, 1")
b1 Main zone – Space heating/cooling – Water IN (screw connection, 1")
b2 Main zone – Space heating/cooling – Water OUT (screw connection, 1")
c1 DHW – Cold water IN (screw connection, 3/4")
c2 DHW – Hot water OUT (screw connection, 3/4")
4 Install the following components (field supply) on the cold water inlet of the
DHW tank:
a
a Shut-off valve (recommended)
b Non-return valve (recommended)
c1 DHW – Cold water IN (screw connection, 3/4")
c2 DHW – Hot water OUT (screw connection, 3/4")
d Pressure reducing valve (recommended)
*e Pressure relief valve (max. 10 bar (=1.0 MPa))(mandatory)
*f Tundish (mandatory)
*g Expansion vessel (mandatory)
NOTICE
It is recommended to install shut-off valves to domestic cold water in and
domestic hot water out connections. These shut-off valves are field supplied.
However, make sure there is no valve between the pressure relief valve (field
supply) and the DHW tank.
NOTICE
To avoid damage to the surroundings in case of water leakage, it is recommended to
close the domestic cold water inlet shut‑off valves during periods of absence.
NOTICE
A pressure relief valve (field supply) with an opening pressure of maximum 10  bar
(=1  MPa) must be installed on the domestic cold water inlet connection in
accordance with the applicable legislation.
a2
a1
c2
c1
*e
*f
d
b
*g
c2
c1
a
ERLA11~16D + EBVZ16S18+23D
Daikin Altherma 3 R F
4P643604-1B – 2022.05