To Connect The Space Cooling/Heating On/Off Output - Daikin EBVZ-D9W Installer's Reference Manual

Table of Contents

Advertisement

9
|
Electrical installation

9.3.7 To connect the space cooling/heating ON/OFF output

Installer reference guide
120
B
A
B
a Installation of EKRP1HBAA (+ mounting plate, see
4
plate" [
 128]) is required.
b Prewiring between X2M/7+9 and Q1L (= thermal protector backup heater). Do NOT
change.
3 Fix the cable with cable ties to the cable tie mountings.
Wires: (2+1)×0.75 mm²
Maximum load: 0.3 A, 250 V AC
1 Open the following (see
1 Top panel
2 User interface panel
3 Upper switch box cover
2 Connect the space cooling/heating ON/OFF output cable to the appropriate
terminals as shown in the illustration below.
2
1
X2M
7
9
A4P
Y2
YC
b
7
9
X2M
A4P
a
"7.2.4 To open the indoor
1+2
Wires connected to the space
cooling/heating ON/OFF output
3
Wire between X2M and A4P
A4P
Installation of EKRP1HBAA is
3
required.
"9.4 To install the mounting
4
unit" [
 65]):
1
ERLA11~16D + EBVZ16S18+23D
Daikin Altherma 3 R F
4P643604-1B – 2022.05
3
2

Advertisement

Table of Contents
loading

Table of Contents