Example: Air purge on additional zone:
b
a
d
a Outdoor unit
b Indoor unit
c Backup heater
d Plate heat exchanger
e DHW tank
M1S 3-way valve (mixing valve for the main/mixed zone)
M3S 3-way valve (space heating/domestic hot water)
To perform a manual air purge
INFORMATION
When purging the main zone, make sure the setpoint for the main zone is at least
5°C higher than the actual water temperature inside the unit.
Conditions: Make sure all operation is disabled. Go to [C]: Operation and turn off
Space heating/cooling and Tank operation.
1 Set the user permission level to Installer. See
the user permission
2 Go to [A.3]: Commissioning > Air purge.
3 In the menu, set Type = Manual.
4 Select Start air purge.
5 Select OK to confirm.
Result: The air purge starts. It stops automatically when ready.
e
M1S
c
45°C
M3S
e
M1S
c
45°C
M3S
4
level" [
 132].
45°C
35°C
45°C
35°C
"To change
ERLA11~16D + EBVZ16S18+23D
Daikin Altherma 3 R F
4P643604-1B – 2022.05

Advertisement

Table of Contents
loading

Table of Contents