To install the Powerware
follows:
1
Plug the UPS power cord into the input connector at the UPS rear panel.
2
Plug the other side of the UPS power cord into a power outlet.
3
Plug the CR 30-X digitizer and the NX Workstation into the appropriate UPS
output receptacles.
In case of power failure, the batteries of the UPS supplies power to the CR 30-X and
the NX Workstation.
2385A EN 20060630
®
5115 UPS into the CR 30-X System, proceed as
CR 30-X S
YSTEM
9
Introduction