Preparing for Operation
6. Test Run:
Perform a no-load test run and an actual loading test run to check that the motor and
peripheral devices operate normally. Refer to page 4-39.
Check the direction of motor rotation and check that the limit switches operate nor-
mally. Operate the Inverter with the Digital Operator first, then with the controller.
7. Production Run:
The Inverter is ready to run. If any error has occurred, refer to Section 5 Operation.
4-2 Using the Digital Operator
4-2-1 Name and Function of Each Component
H Name of Each Component
Display
section
Operation
keys
Mode Key
Increment Key
RUN Key
Data display section
Monitor item indicators
In-service item indicators (green indicators)
These items can be monitored or set even
during operation.
Stopped item indicators (red indicators)
These items can be set only when the
Inverter is stopped.
Constant item indicators
Enter Key
Decrement Key
STOP/RESET Key
Chapter 4
4-3