Removal Of Pcbs - Daikin H Series Service Manual

Inverter pair wall mounted type
Hide thumbs Also See for H Series:
Table of Contents

Advertisement

SiUS04-924_A
2.3

Removal of PCBs

Procedure
Step
1
Remove the cover.
2
Disconnect the
connectors [S52]
[S102] from the service
monitor PCB.
3
Detach the 4 clamps
with pliers and remove
the service monitor
PCB.
170
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
[S102]
[S52]
Service monitor PCB
Clamp
Cover
(R9611)
(R5280)
(R14546)
(R9629)
Outdoor Unit
Points
Preparation
 Remove the electrical box
according to the "Removal of
Electrical Box".
Removal Procedure

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents