Mercedes-Benz EQS 2021 Operator's Manual page 645

Hide thumbs Also See for EQS 2021:
Table of Contents

Advertisement

4
Pull plug
with the cable and hose
#
of the tyre inflation compressor housing.
Push the plug of hose
5
into flange
#
tyre sealant bottle
1
until the plug engages.
Place tyre sealant bottle
1
#
into recess
2
of the tyre inflation compres-
sor.
Remove the valve cap from valve
#
faulty tyre.
Screw filling hose
#
5
out
6
of
head downwards
7
on the
8
onto valve 7.
ohne
Breakdown assistance 643
4
Insert plug
into a 12 V socket in your vehi-
#
cle.
Switch on the vehicle.
#
Switch on the tyre inflation compressor using
#
On/Off switch 3.
The tyre is inflated. First, tyre sealant is pum-
ped into the tyre. The pressure may briefly rise
to approximately 500 kPa (5.0 bar/73 psi).

Advertisement

Table of Contents
loading

Table of Contents