P0-3 Deutz Engine Maintenance - Under 1000 Hours - Terex Genie GS-2646 AV Maintenance Manual

Table of Contents

Advertisement

June 2022
P0-3 De utz Engi ne Maint ena nce – Und er 1 000 Hou rs
P0-3
Deutz Engine Maintenance – Under 1000 Hours
Additional engine maintenance is required. Refer to the Programmed Maintenance Inspection Report for
the specific intervals that apply.
Required maintenance procedures and additional engine information are available in the manufacturer's
manuals. Refer to Specifications, Engine Operator and Maintenance Manuals.
This maintenance schedule applies to the following Deutz Engines:
Deutz D2011L03i
Deutz Engines
Procedure
Oil level - check
Coolant level - check
Oil, fuel and coolant systems - check for leaks
Fuel system filter/water separator – inspect/drain
Air filter discharge valve - clean
Exhaust system - inspect
Check / clean the oil cooler and cooling fins
Air filter - replace
Valve clearance - check/adjust
Engine coolant - test/add
Air intake pipes - inspect
V-belts - inspect
Fuel filter / separator - replace
Part No. 1272215GT
Programmed Maintenance Procedures
Deutz D 2.9 L4
Scissor Lifts
Daily
∅ = Not required
Maintenance Manual
Hour Intervals
250
500
63

Advertisement

Table of Contents
loading

Table of Contents