Maintenance Schedule - Terex Genie GS-2646 AV Maintenance Manual

Table of Contents

Advertisement

June 2022

Maintenance Schedule

Maint enan ce Sche dule
The maintenance procedures have been divided
into subsections that include: Commissioning,
Quarterly, Annually and Programmed maintenance
intervals. The maintenance inspection report has
been divided into general areas of the machine
that include: Drive Chassis, Platform, Functions
and Controls, Engine and Electrical.
Failure to perform these procedures may result in
poor performance, component damage and unsafe
operating conditions. They are essential to safe
operation, machine performance and service life.
Commissioning: A series of required one time
maintenance procedures to be performed at
50 and 150 hour intervals.
Quarterly and Annually: A series of maintenance
procedures to be performed quarterly or annually.
Programmed: A series of maintenance
procedures to be performed during a Pre-Delivery
Preparation or based on machine operating hours.
Maintenance Inspection Report
The maintenance inspection report contains
checklists for each type of scheduled inspection.
Make copies of the Maintenance Inspection Report
to use for each inspection. Maintain completed
forms for a minimum of 4 years or in compliance
with your employer, jobsite and governmental
regulations and requirements.
Instruction Examples
Commissioning Example:
Quarterly and Annually Example:
Part No. 1272215GT
Maintenance Procedures
Programmed Example (under 1000 HRS):
Programmed Example:
Instructions Legend
Use the following detailed descriptions to identify
the intended use of the maintenance inspection
reports.
Specific Interval: blank box is the interval to
be completed and the ∅ marks the interval
as not required.
The description of the procedure or
checklist to be completed.
The procedure number or checklist to be
completed.
Check box to indicate status of inspection.
Specific interval is not required for this
procedure.
General area of the machine to complete
the procedure.
If this box has a designated time interval:
this is the specific time interval to complete
the procedure or checklist.
If this box is empty: the maintenance
checklist will include multiple time intervals,
use this box to write in the specific interval
for the inspection completed.
Scissor Lifts
Maintenance Manual
21

Advertisement

Table of Contents
loading

Table of Contents