Com m issio ni ng Pr o ce dur es
C-1
C-1 Per for m 50 Hou r Servic e

Perform 50 Hour Service

The 50 hour maintenance procedure is a one time
sequence of procedures to be performed after the
first 50 hours of usage. After this interval, refer to
the maintenance inspection report for continued
scheduled maintenance.
1
Perform the following maintenance
procedures:
All Models:
Q-15
Inspect the Tires, Wheels and Lug/Castle
Nut Torque
P1-2
Replace the Drive Hub Oil - GS-69, GS-
84, GS-90
P2-2
Replace the Hydraulic Filters
Part No. 1272215GT

Commissioning Procedures

C-2
C-2 Per for m Engin e M ainte nanc e – 50 H ours
Perform Engine Maintenance - 50
Hours
The 50 hour maintenance procedure is a one time
sequence of procedures to be performed after the
first 50 hours of usage. After this interval, refer to
the maintenance inspection report for continued
scheduled maintenance.
Ford Models
• Oil, coolant, fuel, exhaust and vacuum
hoses - check for leaks, damage or
deterioration
• Electrical wiring - check for chafing or
damage
• Engine oil - replace
• Oil filter - replace
Kubota Models
• Engine oil - replace
• Oil filter - replace
Kohler Models
• Engine oil - replace
• Oil filter - replace
GM Models
• Cylinder head bolts - torque
40.5 ft-lbs / 55 Nm)
• Valve clearance - check/adjust
Required maintenance procedures and additional
engine information are available in the
manufacturer's manuals. Refer to Specifications,
Engine Operator and Maintenance Manuals.