Powering Up The C Series Controller; Powering Up; Status Leds - Juniper C Series Hardware Manual

Hide thumbs Also See for C Series:
Table of Contents

Advertisement

Chapter 4

Powering Up the C Series Controller

Powering Up

This chapter describes how to power up the C Series Controller. Topics include:
Powering Up on page 19
Status LEDs on page 20
The Next Step on page 20
NOTE: In this procedure we assume that the system is already connected to a power
source.
For specifications of the electrical requirements for the system, see "System
Specifications" on page 39.
CAUTION: Evaluate the overall loading of the branch circuit before you install any
equipment into a rack.
To power up the system:
Verify that the power source is operational and turned on.
1.
Inspect all grounding and power connections to the system.
2.
Confirm that all connections are secure.
3.
Push the PWR button.
4.
Monitor the LEDs to verify that the system is booting properly.
5.
When the prompt appears on the system console, you can log in and configure
the system.
See the "Setting the Initial Configuration" on page 21 and SRC PE CLI User Guide for
more information.
19
Powering Up

Advertisement

Table of Contents
loading

This manual is also suitable for:

C2000C4000

Table of Contents