Powering Up The C-Series Platform; Powering Up; Status Leds; The Next Step - Juniper C2000 Hardware Manual

Hide thumbs Also See for C2000:
Table of Contents

Advertisement

Chapter 4

Powering Up the C-series Platform

Powering Up

This chapter describes how to power up the C-series platform. It contains the following
topics:
Powering Up
on page 19
on page 20

Status LEDs

on page 20

The Next Step

NOTE: In this procedure we assume that the system is already connected to a power
source.
For specifications of the electrical requirements for the system, see "System
on page 35.
Specifications"
CAUTION: Evaluate the overall loading of the branch circuit before you install any
equipment into a rack.
To power up the system:
Verify that the power source is operational and turned on.
1.
Inspect all grounding and power connections to the system.
2.
Confirm that all connections are secure.
3.
Push the PWR button.
4.
Monitor the LEDs to verify that the system is booting properly.
5.
When the prompt appears on the system console, you can log in and configure
the system.
See the "Setting the Initial Configuration" on page 21 and SRC PE CLI User Guide for
more information.
19
Powering Up

Advertisement

Table of Contents
loading

This manual is also suitable for:

C4000C series

Table of Contents