Unpacking And Inspecting The C Series Controller; Before You Begin; Unpacking The Units; Inspecting System Components And Accessories - Juniper C Series Hardware Manual

Hide thumbs Also See for C Series:
Table of Contents

Advertisement

Chapter 2
Unpacking and Inspecting the C Series
Controller

Before You Begin

Unpacking the Units

Inspecting System Components and Accessories

This chapter reviews shipping contents and unpacking procedures for the C Series
Controller. Topics include:
Before You Begin on page 11
Unpacking the Units on page 11
Inspecting System Components and Accessories on page 11
If You Detect or Suspect Damage on page 12
Contacting Juniper Networks on page 12
The Next Step on page 12
Before you begin unpacking the item, be sure you have the following tools:
A No. 2 Phillips screwdriver
A utility knife
A mechanical lift, or at least one person to assist in lifting
The systems are delivered boxed. For your convenience, we recommend that you
unpack the system in the location where you want to install it.
WARNING: Three people are required to install the system in a rack: two to lift it
into position and one to screw it to the rack.
After you remove the equipment from the shipping containers:
Confirm the contents of each container.
Inspect all external surfaces and external connectors for visible signs of damage.
11
Before You Begin

Advertisement

Table of Contents
loading

This manual is also suitable for:

C2000C4000

Table of Contents