Rack-Mounting Guidelines; Before Installing The Rack-Mount Support Brackets; Installing And Removing The Brackets; Required Equipment - IBM SAN192C-6 Installation, Service And User Manual

Hide thumbs Also See for SAN192C-6:
Table of Contents

Advertisement

Rack-Mounting Guidelines

CAUTION : If the rack is on wheels, ensure that the brakes are engaged or the rack is otherwise
stabilized.
CAUTION : If installing this kit in an EIA rack, attach the switch to all four rack-mounting rails; the
EIA rails may not be thick enough to prevent flexing of the shelf brackets if only two rails are used.

Before Installing the Rack-Mount Support Brackets

Before installing the rack-mount support brackets for the IBM c-type SAN switches and directors, check
the contents of your kit. Table 12 on page 49 lists the contents of the shelf bracket kit.
Table 12. Contents of Rack-Mount Support Brackets Kit
Quantity
2
20
20
20

Installing and Removing the Brackets

This section provides information on how to install and remove brackets.
Before installing the shelf brackets, check the contents of your kit. Table 13 on page 49 lists the
contents of the shelf bracket kit.
Table 13. Contents of Shelf Bracket Kit
Quantity
2
2
1
2
16
16

Required Equipment

You need the following equipment for this installation:
• Number 2 Phillips screwdriver
• Tape measure and level (to ensure shelf brackets are level)
Part Description
Bottom support brackets
12-24 x 3/4-in. Phillips screws
M6 x 19 mm Phillips binder-head screws
10-32 x 3/4-inch screws
Part Description
Slider brackets
Shelf brackets
Crossbar
10-32 x 3/8-in. Phillips pan-head screws
12-24 x 3/4-in. Phillips screws
10-24 x 3/4-in. Phillips screws
Chapter 2. Rack Installation  49

Advertisement

Table of Contents
loading

This manual is also suitable for:

San384c-6San768c-6

Table of Contents