Fluke SONOCHEK Operating Instructions Manual page 50

Ultrasonic measuring device for preventative plant maintenance
Table of Contents

Advertisement

SONOCHEK
3.5.6
Connecting the sensor
 Connect the sensor to the SONOCHEK via the associated cable according to the marking.
 The sensor is powered via the cable and the measurement data is automatically transferred
to the SONOCHEK.
 The sensor is ready for operation once the LED of the operating display illuminates green.
3.5.7
Assembly and disassembly probe tip
The screw thread of the probe tip assembly aid is used to fasten the sensor accessories onto
the sensor shaft. The key set DBS20 prevents damage when screwing and unscrewing the
probe tip.
50
Damage to the plug-in connectors possible!
Note the mark with the red dot, which specifies the plug-in position on the
bushing and plug.
Damage to the sensor is possible!
Note that the black protective cover cannot be removed. The sensor may
be damaged during disassembly
Device damage and incorrect readings possible!
 It is possible to destroy the probe tip holder from incorrect assembly and
disassembly. Both elements of the key set DBS20 (see figure below)
must be used to assemble and disassemble the probe tip.
 Ensure that the probe tip is firmly screwed into the holder. The
ultrasound is directed to the ultrasonic converter through the
attachments. Loosely attached sensor attachments may affect the
signals.
Operation of the device, sensor system and apps
SONOCHEK 09.2018

Advertisement

Table of Contents
loading

Table of Contents