Base
BY09
The Base For Your Building
OPTION 1: ARROW FLOOR FRAME KIT:
(Order No. FB109-A or 68385-A)
Arrow has the best base for your building in this simple kit. It keeps stored items above the ground.
This kit should be used with one of the following:
A. To support a plywood deck B. To be fi lled with sand. We recommend the combined use of
1. an ARROW FLOOR FRAME KIT and 2. an ARROW ANCHORING KIT as an effective method of securing the building to the
ground. Allow 1 - 2 hours for construction.
OPTION 2: Wood Platform
If you decide to build your own base, be sure to select the appropriate materials.
These are the recommended materials for your base:
 2 x 4's (38 mm x 89 mm) Pressure Treated Lumber
 5/8" (15,5 mm) 4 x 8 (1220 mm x 2440 mm) Plywood-exterior grade NOTE: Pressure Treated Lumber must not be used where
it
will make contact with your storage building. The properties of Pressure Treated Lumber will cause accelerated corro-
sion.
If Pressure Treated Lumber comes in contact with your storage building your warranty will be voided.
 10 & 4 penny Galvanized Nails  Concrete Blocks (optional)
The platform should be level and fl at (free of bumps, ridges etc.)
to provide good support for the building. The necessary materials
may be obtained from your local lumber yard.
To construct the base follow instructions and diagram.
Construct frame (using 10 penny galvanized nails)
Measure 16"/24" (40,6 cm/61,0 cm) sections to construct
inside frame (see diagram)
FRONT
Secure plywood to frame (using 4 penny galvanized nails)
(DOOR)
Allow 6 - 7 hours for construction.
Note: Platform/Slab will extend 9/16" (1,4 cm) beyond fl oor
frame on all four sides. Seal this 9/16" (1,4 cm) of wood with
a roofi ng cement (not included), or bevel this 9/16" (1,4 cm) of
OPTION 3: Concrete Slab
concrete when pouring, for good water drainage.
The slab should be at least 4" (10,2 cm) thick. It must be level and fl at to provide good support for the frame.
The following are the recommended materials for your base.
 1 x 4's (19 mm x 89 mm) (will be removed once the concrete cures)
 Concrete  Sheet of 6 mil plastic
 We recommend for a proper strength concrete to use a mix of:
1 part cement  3 parts pea sized gravel  2 1/2 parts clean sand
Prepare the Site/Construct a Base
1. Dig a square, 6" (15,2 cm) deep into the ground (remove grass).
2. Fill up to 4" (10,2 cm) in the square with gravel and tamp fi rm.
3. Cover gravel with a sheet of 6 mil plastic.
4. Construct a wood frame using four planks of 1x4 (19 mm x 89 mm)
FRONT
lumber.
(DOOR)
5. Pour in concrete to fi ll in the hole and the frame giving a
total of 4" (10,2 cm) thick concrete. Be sure surface is level.
Note: Finished Slab dimensions, with lumber removed.
Allow 3 - 5 hours for construction and a week for concrete curing time.