Roof Assembly - Arrow Storage Products BD88GB Owner's Manual & Assembly Instructions

Storage area: 59 sq. ft. 314 cu. ft. 5,5 m2 8,9 m3
Table of Contents

Advertisement

Step 14
BY27
1
Install a left roof panel at the left
rear and right front corner of the roof.
Install a right roof panel at the left
front corner of the roof.
2
Cut 4 short 2" (5,1 cm) strips off
the roll of weather stripping tape,
and put them aside. Cover the joint at
the peak with weather stripping tape.
Unroll the tape and press it down over
the opening at the ridge as you install
each roof panel. Do not cut the tape
at this time.
3
Install 2 narrow and 2 wide roof
panels in the sequence and positions
shown on previous page. Do not fas-
ten the lower end of the panels to the
side wall angles at this time. Continue
weather stripping the ridge opening.
NOTE
Narrow roof panel crimped rib is
overlapped by wide rib of
adjacent panel where possible.
NOTE
If roof beam holes do not line up
with the roof panel holes, shift the
building from left to right.
If this does not help, your building
may not be level. Shim the
corners until holes line up.
 Parts Needed For 

Roof Assembly

8467 Left Roof Panel
9978 Roof Panel
7875 Roof Panel
8466 Right Roof
Panel
Fasten At
Overlap with
Bolt
Screws To
Roof Beam
27
 8466 Right Roof Panel (1)
 8467 Left Roof Panel (2)
 7875 Roof Panel (2)
 9978 Roof Panel (2)
STEP
1
Weather Stripping
Tape Roll
Screws To
Roof Beam
Fasten At
Overlap with
Bolt
Do not fasten
at this time
STEP
2
9978 Roof Panel
7875 Roof Panel
STEP
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nw88p-aMo88Wm88

Table of Contents