Arrow Storage Products BD88GB Owner's Manual & Assembly Instructions

Arrow Storage Products BD88GB Owner's Manual & Assembly Instructions

Storage area: 59 sq. ft. 314 cu. ft. 5,5 m2 8,9 m3

Advertisement

Quick Links

Owner's Manual & Assembly Instructions
BY01
Model No.
709980715
Storage Area:
59 Sq. Ft.
5,5 m
BUILDING DIMENSIONS * Size rounded off to the nearest foot
*Approx.
Base
Size
Size
8' x 8'
97 1/2" x 92 3/4"
2,4m x 2,3m 247,7 cm x 235,6 cm
BD88
NW88P-A
Missing Parts, Questions on Assembly?
Call: 1-800-851-1085 or
assist@arrowsheds.com
Do not return to dealer, they are not
equipped to handle your requests.
314 Cu. Ft.
8,9 m
2
3
Exterior Dimensions
(Roof Edge to Roof Edge)
Width
Depth
99 3/4"
95 1/4"
253,4 cm
241,9 cm
MO88
WM88
CAUTION: SOME PARTS HAVE SHARP EDGES. CARE
MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES
TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ
SAFETY INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES
WHEN HANDLING METAL PARTS.
Interior Dimensions
(Wall to Wall)
Height
Width
67 7/8"
94 3/4"
172,4 cm
240,7 cm
BD88GB
Depth
Height
Width
90"
66 5/8"
43 1/2"
228,6 cm
169,2 cm
110,5 cm 147,3 cm
Door
Opening
Height
58"

Advertisement

Table of Contents
loading

Summary of Contents for Arrow Storage Products BD88GB

  • Page 1 Owner's Manual & Assembly Instructions BY01 Model No. BD88 MO88 BD88GB NW88P-A WM88 Missing Parts, Questions on Assembly? Call: 1-800-851-1085 or assist@arrowsheds.com Do not return to dealer, they are not equipped to handle your requests. 709980715 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE...
  • Page 3 BEFORE YOU BEGIN..Owner's Manual Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable. Assembly Instructions: Instructions are supplied in this manual and contain all appropriate information for your building model.
  • Page 4: Tools And Materials

    PLAN AHEAD..Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people should work together to assemble your building.
  • Page 5 SAFETY FIRST..Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various •Practice caution with the tools being used in pieces of your building since some contain the assembly of this building. Be familiar with sharp edges.
  • Page 6 CARE & MAINTENANCE..Finish: For long lasting fi nish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation. Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom.
  • Page 7 ACCESSORIES..FLOOR FRAME KITS ROOF STRENGTHENING (heavy snow load) KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof. BEFORE AFTER ANCHOR KITS Model No. AK4 MODELS FB47410, FB5465, FB106-A Anchor Kit contains heavy-duty steel FB109-A and FB1014-A augers, 60' (18 m) of steel cable and...
  • Page 8: Special Note

    ORDERING ACCESSORIES..02/13 We recommend that you purchase accessory items from your local storage building dealer whenever possible; however, because the full line of accessories is not always available from all dealers, Arrow is offering them to you on a direct basis. There are two ways to order Arrow Storage Building Accessories: Option 1 Option 2...
  • Page 9 Base BY09 The Base For Your Building OPTION 1: ARROW FLOOR FRAME KIT: (Order No. FB109-A or 68385-A) Arrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used with one of the following: A.
  • Page 10 Anchoring Anchoring Down The Building It is important that the entire fl oor frame be anchored after the building is erected. Below are recommended ways of anchoring. Anchoring into Wood/Post: Arrow Anchoring Kit: (Model No. AK4 or 60298) Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm) Recommended for use with any suggested base.
  • Page 11 Hardware BY11 Remove from bag of screws and save for the last step 65900A #10Bx1/2" (13 mm) 65923 65004 65103 Black Screw (8) #8-32x3/8" (10 mm) #8Ax5/16" (8 mm) #8-32 Hex Nut (175) (Packed with Screws) Bolt (175) Screw (311) 65109 67468 66646...
  • Page 12: Parts List

    Parts List BY12 Part Part Quantity Check Number Description in Carton List 6615 Rear Wall Angle 6617 Door Track Splice 10498 Horizontal Door Brace 6658 Gable Brace 7875 Roof Panel 7906 Right Gable 7907 Left Gable 8486 Ridge Cap 8466 Right Roof Panel 8467 Left Roof Panel...
  • Page 13 Parts List BY13 Part Part Quantity Check Number Description in Carton List 10488 Right and Left Doors 9363 Wall Panel 9900 Door Jamb 9924 Rear Wall Channel 9377 Rear Floor Frame 9378 Door Track 9379 Front Floor Frame 9380 Front Corner Panel 9384 Rear Corner Panel 8836...
  • Page 14  8941 Ramp (1) Step 1  Parts Needed For   9379 Front Floor Frame (2) Floor Frame Assemblies  9377 Rear Floor Frame (2) BY14  9989 Side Floor Frame (4) The front fl oor frame is made up of 3 pieces.
  • Page 15: Frame Assemblies

     6615 Rear Wall Angle (2) Step 2  Parts Needed For   9924 Rear Wall Channel (2) Frame Assemblies  9990 Side Wall Channel (4) BY15 9991 Side Wall Angle (4) The main frame pieces reinforce the walls. These pieces will later be 9924 9924 installed in the center and at the top...
  • Page 16 Step 3  Parts Needed For   10470 Roof Beam (4) Roof Beam Assemblies  10471 Roof Beam (8) BY16 The roof beams join the 2 gables and support the roof panels. The roof assembly is made up of 4 pieces 2"...
  • Page 17: End View

    Step 4  Parts Needed For   6617 Door Track Splice (1) Door Track Assembly  9378 Door Track (2) NOTE: Door Track Splice (painted part) The door track assembly supports the sliding doors and reinforces the front wall. It is made up of three pieces. 6617 Using the door track splice, (painted), join the door track...
  • Page 18 Step 5  Front Floor Assembly (1)  Parts Needed For   Side Floor Assembly (2) Floor Frame  Rear Floor Assembly (1) BY18 RIGHT REAR 9989 STEP 9377 Assemble the four corners of the fl oor frame using two screws at each corner as shown.
  • Page 19: Top View

    Step 6  Parts Needed For   9380 Front Wall Panel (2) Corners  9384 Rear Corner Panel (2) BY19 NOTE The remainder of the building assembly Wide Side requires many hours and more than one person. Do not continue beyond this 9384 point if you do not have enough time to Narrow Side...
  • Page 20  Door Track Assembly (1) Step 7  Rear Wall Angle Assembly (1)  Parts Needed For   Side Wall Angle Assemblies (2) Frames  Rear Wall Channel Assembly (1) BY20  Side Wall Channel Assemblies (2) 6615 The main frame pieces give rigidity to the side walls and provide a surface Wall Angles for attaching the gables which sup-...
  • Page 21 Step 8  Parts Needed For   8995 Wall Panel (2) Wall Panels  9363 Wall Panel (2) BY21  9364 Wall Panel (4) The wall panels come in two widths. STEP Each wall panel has a crimped rib 9363 9363 on one side.
  • Page 22 Step 9  Parts Needed For   9900 Door Jamb (2) Door Jamb The door jambs reinforce the door opening and provide an attractive trim. Follow these steps for both STEP door jambs. (3) bolts TOP VIEW Door Track Fasten a door jamb to the front Hex Nut panel with three bolts, nuts and...
  • Page 23 Step 10  Parts Needed For   7906 Right Gable (2)  7907 Left Gable (2) Gable Assemblies  7916 Roof Beam Bracket (4) The gables go on top of the front and rear walls to support the roof beams. NOTE The gables are packed nested together and might be mistaken...
  • Page 24 Step 11  Left Gable Assembly (2)  Parts Needed For   Right Gable Assembly (2) Gables/Braces  6658 Gable Brace (2) BY 24 Lift and fasten a right and left gable, under angle at corner, to the rear wall angle with screws.
  • Page 25 Step 12  Parts Needed For   Main Roof Beam (1) Roof Beams  Outer Roof Beam (2) BY25 Fasten the main roof beam to the gable brace of the front gable. STEP Fasten the other end of the main 2"...
  • Page 26 Step 13  Parts Needed For   8466 Right Roof Panel (1) Right Roof Panel STEP Installing the roof panels is best done with a step ladder. Begin installing 8466 8467 roof panels at the back right corner of the building. Each screw and bolt in the roof requires a washer.
  • Page 27: Roof Assembly

     8466 Right Roof Panel (1) Step 14  Parts Needed For   8467 Left Roof Panel (2) Roof Assembly  7875 Roof Panel (2) BY27  9978 Roof Panel (2) STEP Install a left roof panel at the left 8467 Left Roof Panel STEP rear and right front corner of the roof.
  • Page 28 Step 15  8840 Ridge Cap (1)  Parts Needed For   9978 Roof Panel (2) Ridge Caps & Panels  8486 Ridge Cap (1) BY28 Install the fi rst ridge cap on the completed roof section using bolts and nuts.
  • Page 29 Step 16  Parts Needed For   8485 Left Side Roof Trim (2) Roof Trim  8836 Right Side Roof Trim (2) Attach the right and left side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap.
  • Page 30: Door Assembly

    Step 17  10488 Right and Left Doors (2)  Parts Needed For   10498 Horizontal Door Brace (4) Door Assembly  9355 Vertical Door Brace (2) The steps on this page tell how to assemble the right door. You will perform exactly the same procedures for the left door.
  • Page 31 Step 18  Parts Needed For   Right Door Assembly (1) Door Installation & Adjustment  Left Door Assembly (1) Horizontal Door Brace Gable Door Track Door Slide From inside the building, put the bottom of the right door assembly (on your left when you are inside the STEP STEP...
  • Page 32 BD88 MO88 BD88GB NW88P-A WM88 BY32 Anchoring and Floor Frame Anchoring Anchor your building at this time. Floor Frame If you have purchased a Floor Frame Kit you need to install it at this time. SOME FACTS ABOUT RUST 1. Avoid nicking or scraping the coating surface, Rusting is a natural oxidizing process that occurs inside and out.

This manual is also suitable for:

Nw88p-aMo88Wm88

Table of Contents