Arrow Storage Products BD88GB Owner's Manual & Assembly Instructions page 20

Storage area: 59 sq. ft. 314 cu. ft. 5,5 m2 8,9 m3
Table of Contents

Advertisement

Step 7
BY20
The main frame pieces give rigidity to
the side walls and provide a surface
for attaching the gables which sup-
port the roof.
1
Fasten the rear wall angle as-
sembly across the inside top of the
rear wall using screws.
2
Fasten the rear wall channel as-
sembly across the middle of the rear
wall using screws.
3
Fasten the side wall angle as-
semblies across the inside top of the
side panels using screws. Side wall
angles must overlap rear wall angle
in corners.
4
Fasten the side wall channel as-
semblies across the middle of the
side panels using screws. Fasten
overlaps in rear corners with screws.
5
Fasten the door track assembly
(holes on top) across the top of the
front wall panels using screws. See
the fi gure.
 Parts Needed For 
Frames
Wall Angles
Must Face
Inside
Building
STEP
STEP
1
2
9991
STEP
STEP
4
3
9378
20
 Door Track Assembly (1)
 Rear Wall Angle Assembly (1)
 Side Wall Angle Assemblies (2)
 Rear Wall Channel Assembly (1)
 Side Wall Channel Assemblies (2)
6615
9924
9990
Long Leg
on Top
Opening
Facing in
Short Leg
on Bottom
STEP
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nw88p-aMo88Wm88

Table of Contents