■ Procedure
1. Remove the ITB Cleaning Blade [1], and lay down the ITB Unit such that the Primary Transfer Roller is visible.
2. Remove the Primary Transfer Roller Retainer Member [1].
3. Remove the Primary Transfer Roller [1].
NOTE:
• Parts Counter : COPIER > COUNTER > DRBL-1 > TR-ROLK
• Parts Counter : COPIER > COUNTER > DRBL-1 > TR-ROLC
• It is also cleared at the same time when TR-UNIT is cleared.
• After installation, execute [Auto Adjust Gradation> Full Adjust], [Auto Correct Color Mismatch].
Removing the Patch Sensor Unit
[1]
[1]
334
4. Parts Replacement and Cleaning
[1]