1
4.
Plug
in the power cord and switch the power ON.
5. Tension running belt to specification and verify tracking alignment, see
Tension and Tracking Adjustment" on
6. Reinstall the endcaps and belt guards.
7. Reinstall the hood cover.
8. Do the Operation Verification tests (see
return to service..
1
Device power cord connector or electrical cable male connector that is inserted into an
electrical receptacle "outlet" (also called the plug-in).
Contact Precor Customer Support at support@precor.com or 800.786.8404 with
any questions.
page 52.
"Operation Verification" on
6 Replacement Procedures
Take-up Roller Replacement
"Running Belt
page 17) and
Page 76