Responsibility Matrix - Canon imagePRESS C910 Customer Expectation Document

Hide thumbs Also See for imagePRESS C910:
Table of Contents

Advertisement

17. Responsibility Matrix

Ensure adequate space and power to properly install machine.
Verify floor strength and level.
Ensure that the equipment can be delivered to the site, and that the path
is clear and unobstructed.
Unpack all delivered items.
Install all system hardware.
Connect all system components.
Install printer files and either the imagePRESS Printer Kit-F1,
imagePRESS Server G250, H350, or PRISMAsync Print Server.
Ensure network configuration, and confirm that the device is attached to
the network.
Install client workstation network software.
Load additional fonts (as required).
Order and replace, as necessary, customer replaceable items
(i.e., drums, toner, etc.).
Order and replace the waste toner container, as necessary.
Provide technical support.
Provide on-site support.
Establish an installation file of a typical job, and retain for future
reference.
Perform an Auto Gradation Adjustment once a day (only if the
imagePRESS Printer Kit-F1, imagePRESS Server H350, or
imagePRESS Server G250 is attached).
Perform a Media family calibration for color consistency once a day (only
if the PRISMAsync Print Server is attached).
Primary customer applications for using this equipment:
Special considerations or performance limitations:
I have received a copy of this document.
Customer:
Sales Person:
Version 5
imagePRESS C910/C810/C710 Customer Expectations Document
Action
imagePRESS C910/C810/C710 Customer Expectations Document
Responsibility
Customer
Dealer
Page 129

Advertisement

Table of Contents
loading

This manual is also suitable for:

Imagepress c810Imagepress c710

Table of Contents