Responsibility Matrix - Canon imagePRESS V1000 Customer Expectation Document

Table of Contents

Advertisement

Canon

16. Responsibility Matrix

Ensure adequate space and power to properly install the machine.
Verify floor strength and level.
Make sure the installation site meets the optimal environmental specifications.
Ensure that the equipment can be delivered to the site, and that the path is
clear and unobstructed.
Unpack all delivered items.
Install all system hardware.
Connect all system components.
Install printer files and server.
Ensure network configuration, and confirm that the device is attached to the
network.
Install client workstation network software.
Order and replace, as necessary, replaceable items (i.e., drum and toner).
Order and replace the waste toner container, as necessary.
Provide technical support.
Provide on-site support.
Establish an installation file of a typical job, and retain for future reference.
Perform an Auto Gradation Adjustment, as needed.
Back up important data, such as Inbox and Address Book contents on the
machine's hard drive periodically.
Secure data stored on hard drives and in the Advanced Box.
Store the TPM encryption key (if the TPM setting is set to 'On').
Primary customer applications for using this equipment:
Special considerations or performance limitations:
I have received a copy of this document.
Customer:
Sales Person:
101 For more information, see "Adjustment/Maintenance," in the Settings/Registration e-Manual included with the machine.
Revision 4
Action
imagePRESS V1000 Customer Expectations Document
imagePRESS V1000 Customer Expectations Document
101
Responsibility
Customer
Dealer
Page 123

Advertisement

Table of Contents
loading

Table of Contents