Successful Installation Verification - Avaya Virtual Services Platform 9000 Installation Manual

Hide thumbs Also See for Virtual Services Platform 9000:
Table of Contents

Advertisement

The following figure shows the ESD ground strap input location on the front of the chassis. Two ESD
ground strap input locations also exist on the rear of the chassis.

Successful installation verification

In a normal power-up sequence, the LEDs light as follows:
• After you apply power to the switch, the corresponding power supply power LEDs and cooling
module LED lights amber.
• After the CP module starts to boot, the Online LED for each I/O module lights amber.
• Each I/O module initiates a self-test, during which the port and module LEDs display various
patterns to indicate the progress of the self-test.
• Upon successful completion of the self-test, within 5 to 15 minutes after you apply power,
depending on the module type, the I/O module Online LED transitions from amber to green.
If the LEDs on the modules light in this sequence, your installation is successful. Contact your
network administrator to verify that the Avaya Virtual Services Platform 9000 connects to the
network.
If the LEDs do not light in this sequence, contact your local Avaya Technical Solutions Center.
October 2015
Virtual Services Platform 9012 chassis installation
Installing the Avaya VSP 9000
Comments on this document? infodev@avaya.com
85

Advertisement

Table of Contents
loading

Table of Contents