Avaya Virtual Services Platform 9000 Installation Manual page 26

Hide thumbs Also See for Virtual Services Platform 9000:
Table of Contents

Advertisement

Virtual Services Platform 9010 chassis
Use the following table as a checklist when you verify the contents of the shipping container. For
more information about ordering replacement parts, see
Table 7: VSP 9010 AC chassis shipping accessories
Check
The following figure illustrates the accessories in the chassis shipping container.
October 2015
Part numbers
Accessory
VSP 9010 AC chassis
Eight I/O and CP filler modules
Four SF filler modules
Six power supply filler panels
Eight power cord retainers
Two cooling modules
One DB9 to DB9 connector
One chassis cover panel kit
Screws and hardware:
Phillips-head screws
Clip nuts
Phillips-head screws
Hex nuts
Installation shelf
Grounding kit hardware
Installing the Avaya VSP 9000
Comments on this document? infodev@avaya.com
on page 106.
Usage
You must install filler modules in
unused slots.
You must install filler modules in
unused slots.
You must install filler panels in
unused bays. Power supply bays
1 and 5 ship unpopulated.
Use to prevent the accidental
removal of power cords.
The cover panel kit includes the
cable management cover with two
mounting brackets and screws,
and the air inlet cover with
mounting bracket.
The hardware required to mount
the chassis in a rack depends on
your rack type.
Mount the chassis to a rack rail.
Use the clip nuts, if necessary.
Mount the installation shelf to a
rack rail.
If the rack does not use threaded
rail holes, you must use the
supplied clip nuts with the clip nut
screws.
Mount the chassis in an
equipment rack.
Connect the chassis to the ground
of the rack.
26

Advertisement

Table of Contents
loading

Table of Contents