6. Install retaining ring into groove in bore of PTO gear.
Press two (2) bearings into PTO gear until each bearing
contacts the installed retaining ring.
7. Slide three (3) rods into holes in clutch assembly.
8. Slide PTO gear assembly into clutch assembly.
9. Assemble PTO shaft:
A. Press new bearing onto PTO shaft so that bear-
ing is flush with shaft shoulder.
B. Alternately place three (3) A–plates and three (3)
friction plates onto PTO shaft.
C. Place C–plate and then B–plate onto shaft.
D. Carefully install two (2) seal rings into grooves of
PTO shaft.
Groundsmaster 7200/7210
1
2
1. Bearing
2. PTO gear
2
1. Rod (3 used)
2. Clutch assembly
7
2
1. Seal ring (2 used)
2. PTO shaft
3. B–plate
4. C–plate
Page 4 – 69
3
1
Figure 70
3. Retaining ring
3
1
Figure 71
3. PTO gear
5
5
5
1
6
6
6
Figure 72
5. A–plate (3 used)
6. Friction plate (3 used)
7. Bearing
Hydraulic System
4
3