Installation Overview - Agilent Technologies 4072A Advanced Pre-Installation Manual

Parametric
Hide thumbs Also See for 4072A Advanced:
Table of Contents

Advertisement

General Information

Installation Overview

Installation Overview
This section provides a brief start-to-finish system installation overview.
NOTE
If the steps described in this document are not completed prior to the system installation date, the
Agilent customer engineer (CE) may not be able to install the tester.
The checklist in Chapter 2 , "Site Preparation." is available.
NOTE
Special codes and regulations covering the installation of the test system may apply in your area. It
is the customer's responsibility to ensure that all local laws, regulations, and codes for buildings,
machinery, and electrical distribution systems are complied with before the system arrives.
NOTE
The customer should appoint a principal operator or system manager. This person will be
responsible for operating the 4072/4073 tester, performing operator maintenance when necessary,
and scheduling periodic maintenance. The principal operator's initial responsibilities are to
establish and monitor site preparation schedules, and to order system supplies. The principal
operator must be present for the system installation.
8
Agilent 4072/4073 Preinstallation Guide, Edition 4
Chapter 1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4072b advanced4073a ultra advanced4073b ultra advanced

Table of Contents