Site Preparation

Site Preparation Checklist

Site Preparation Checklist
Table 2-7 provides a site preparation checklist. Check each planning item off as it is completed. If an item is not
applicable to your situation, mark the item "N/A".
Table 2-7
Site preparation checklist
Check
Floor plan
Did you complete the layout for tester, prober, controller, table, and so on?
Is the site suitably ventilated?
Is the floor at the site suitably prepared?
Did you provide a table for service and maintenance?
Is the site suitably lit?
Did you provide a place for storing software media?
Did you install a telephone near the tester?
Did you provide network port, network cable, IP address, and host name?
Did you provide a lock for locking the main switch?
Electrical power
Did you confirm that voltage, frequency, and noise meet requirements? If not, have you initiated
their preparation?
Did you provide a main power cable from the switchboard to the main power supply?
Did you prepare a power line for maintenance service?
Environmental considerations
Did you check the installation area for temperatures with relative humidities?
Did you check the installation area for the floor vibration ≤ 1 mG and floor vibration
transmission frequency ≥ 10 Hz?
If some of the following apply to your site, Agilent Technologies recommends that you measure
floor vibration.
The floor type is the access floor.
The floor is not durable enough for the 4070, prober, and other equipment installed at the
installation site.
Something causing vibration is installed near the installation site.
40
Item
Agilent 4072/4073 Preinstallation Guide, Edition 4
Chapter 2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4072b advanced4073a ultra advanced4073b ultra advanced

Table of Contents