Preparation For Use; Initial Inspection - Agilent Technologies 16191A Operation And Service Manual

Side electrode smd test fixture
Table of Contents

Advertisement

Preparation for Use

Introduction
This chapter explains how to install the 16191A. The topics include the following:

Initial inspection.

Connecting the test xture for use.
Repackaging the test xture for shipment.
Measurement error correcting function for each instrument.
Initial Inspection
The side electrode SMD test xture has been carefully inspected before being shipped from the
factory. It should be in perfect physical condition, no scratches, dents or the like. It should also
be in perfect electrical condition. Verify this by carefully performing an incoming inspection
to check the side electrode SMD test xture set for signs of physical damage and missing
contents. If any discrepancy is found, notify the carrier and Agilent Technologies. Your Agilent
Technologies sales oce will arrange for repair and replacement without waiting for the claim
to be settled.
Inspect the shipping container for damage. Keep the shipping materials until the inspection is
completed.
Verify that the shipping container contains everything shown in Figure 2-1 and listed in
Table 2-1.
Inspect the exterior of the 16191A for any signs of damage.
2
Preparation for Use
2-1

Advertisement

Table of Contents
loading

Table of Contents