Installation

Installation
Installation
Installation
Assemble the
the Proportioner
Proportioner
Assemble
Assemble
the
Proportioner
Reactor 2 proportioners arrive in a shipping
configuration. Before mounting the system, assemble
the proportioner in the upright position.
1. Remove bolts (A) and nuts.
2. Swing the electrical enclosure upright.
3. Reinstall bolt (A) with nut. Tighten bolt (B) and
nut.
4. Position the cable bundles against the frame.
Attach the bundles to the frame with a loose wire
tie (C) on each side.
30
Mounting the
the System
System
Mounting
Mounting
the
System
To prevent serious injury due to system tipping
over, make sure the Reactor is secured to the floor.
NOTE: Wall mounting brackets are not included with
NOTE:
NOTE:
the system. Evaluate the installation to determine
if additional support is required beyond the floor
mounting screws.
1. See
Dimensions, page 74
specifications.
2. Use a minimum of 4 of the 6 mounting holes,
evenly spaced in the base of the system frame,
to secure base to the floor.
NOTE:
NOTE: Bolts are not included.
NOTE:
for mounting hole
334945J

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reactor 2 h-30 eliteReactor 2 h-40Reactor 2 h-40 eliteReactor 2 h-50Reactor 2 h-50 eliteReactor 2 h-xp2 ... Show all

Table of Contents