Startup - Graco Reactor 2 H-30 Operation

Hydraulic proportioning systems
Hide thumbs Also See for Reactor 2 H-30:
Table of Contents

Advertisement

Startup

Startup
Startup
To prevent serious injury, only operate Reactor with
all covers and shrouds in place.
NOTICE
NOTICE
NOTICE
Proper system setup, startup, and shutdown
procedures are critical to electrical equipment
reliability. The following procedures ensure steady
voltage. Failure to follow these procedures will
cause voltage fluctuations that can damage
electrical equipment and void the warranty.
1. Check fluid inlet filter screens.
Before daily startup, ensure that the
fluid inlet screens are clean. See
Fluid Inlet Strainer Screens, page
2. Check ISO lubrication reservoir.
Check level and condition of ISO lube daily. See
Pump Lubrication System, page
3. Use A and B Drum Level Sticks (24M174) to
measure the material level in each drum. If
needed, the level can be entered and tracked in
the ADM. See
Advanced Setup Screens, page
4. Check generator fuel level.
NOTICE
NOTICE
NOTICE
Running out of fuel will cause voltage
fluctuations that can damage electrical
equipment and void the warranty. Do not run
out of fuel.
334945J
5. Confirm main power switch is OFF before starting
6. Ensure the main breaker on the generator is in
7. Start the generator. Allow it to reach full operating
64.
8. Turn
66.
37.
generator.
the off position.
temperature.
Turn main
Turn
main power
main
power switch
power
switch ON.
switch
The ADM will display the following screen until
communication and initialization is complete.
Startup
ON.
ON.
47

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Reactor 2 h-30 eliteReactor 2 h-40Reactor 2 h-40 eliteReactor 2 h-50Reactor 2 h-50 eliteReactor 2 h-xp2 ... Show all

Table of Contents