Maintaining The Chassis; Checking The Machine For Loose Hardware; Maintaining The Sprayer And Spreader Systems; Checking The Sprayer System - Toro Spray Master Series Operator's Manual

46in and 52in sprayer
Table of Contents

Advertisement

Maintaining the Chassis

Checking the Machine for
Loose Hardware
Service Interval: Before each use or daily
1.
Prepare the machine for maintenance; refer to
Preparing the Machine (page
2.
Visually inspect machine for damaged or worn
parts, and check for loose hardware.
Note:
Before operating the machine, replace
any damaged parts and tighten all loose
hardware.
Maintaining the Sprayer
and Spreader Systems
Checking the Sprayer
System
Service Interval: Every 50 hours
51).
Checking the Spreader
System
Service Interval: Every 50 hours
73
1.
Prepare the machine for maintenance; refer to
Preparing the Machine (page
2.
Check all hoses, nozzles, and fittings for
damage and leaks.
Note:
Replace all damaged or leaking sprayer
components.
3.
Check the nozzle strainers and in-line strainers
for accumulation of dirt and chemical sludge.
Note:
Clean or replace strainers with an
accumulation of dirt and chemical sludge.
1.
Prepare the machine for maintenance; refer to
Preparing the Machine (page
2.
Spray the hopper cables, accuway cable, and
the deflector-shield cable with silicone spray, if
needed.
3.
Clean the bottom of the hopper with a wire brush
and clean off any fertilizer, if needed.
4.
Replace the hopper bottom bushing or the
impeller, if needed.
51).
51).

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Spray master 34233Spray master 34235Spray master 34237Spray master3423334235 ... Show all

Table of Contents