Maintaining The Chassis; Checking The Machine For Loose Hardware - Toro 34230 Operator's Manual

Stand-on e-spreader/sprayer
Table of Contents

Advertisement

Figure 99
1. Jam nut (pattern control cable)
2. Linkage rod
3. Impeller shaft
4. 1/8 inch (3.2 mm) gap between ramp tooth and impeller
shaft
5. Ramp tooth
6.
Pull the linkage rod until there is 1/8 inch (3.2
mm) gap between the ramp tooth and the
impeller shaft
(Figure
7.
Tighten the jam nut
8.
Adjust the spread-pattern-control handle; refer
to
Adjusting the Spreader Pattern (page
99).
(Figure
99).
33).

Maintaining the Chassis

Checking the Machine for
Loose Hardware
Service Interval: Before each use or daily
1.
Prepare the machine for maintenance; refer to
Preparing the Machine (page
2.
Visually inspect machine for damaged or worn
parts, and check for loose hardware.
Note:
Before operating the machine, replace
any damaged parts and tighten all loose
hardware.
g027205
71
57).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents